Vault Installation Pre-Checks

Section 1: General Information

Invalid Input
Invalid Input
Invalid Input
Invalid Input

Section 2: Vault Product Information

Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input

Section 3: Vault Data Migration

To ensure enough time has been factored into your upgrade we must establish the size of the vault database & file store and current file quantity. If you are a customer upgrading from vault versions 2011-2013 or your current installation was not performed by Graitec please fill in the section below. If you you are a customer receiving a new installation of vault please skip this section.
Invalid Input
Invalid Input
Invalid Input

Section 4: Server Information

To acquire operating system information from your server press the windows key + pause key on the keyboard. Please select OS from below. Only select from one drop down.
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input

Section 5: Vault Installation Requirements

To ensure the installation and preparation of your vault is smooth we like to establish how some aspects of the vault will be handled this allows Graitec to identify if we require your IT to assist with network administration tasks before or when we arrive on site.
Invalid Input
Invalid Input
Invalid Input

Section 6: Data Checking & Data Loading

If you are about to receive a new installation of vault you may require existing data to be loaded. Data loading is not included as part of the installation of vault but training is provided if you are receiving vault training or vault administration training. We recommend that a Graitec member of staff spend 1 day onsite prior to the installation to perform data checks, from this day a report will produced highlighting issues in data sets, which will include information on: duplicate data, data requiring migration, data with missing links or references that will need amending to ensure successful upload of data. Training will also be provided for techniques on amending the for-mentioned issues during the 1 day onsite data checking.
Invalid Input
Invalid Input

Autodesk Gold Partner